City of Medford Oregon / Planning / Other Plans
ADOPTED PLANS
Medford Pre-Disaster Mitigation Plan
This plan lays out Medford's preparedness strategies for natural disasters.
Bear Creek Master Plan
The Bear Creek Master Plan provides a plan for enhancement of the Bear Creek Corridor. This plan was prepared as an "action plan" intended to kick start the immediate and future redevelopment of the corridor.
Medford Local Wetlands Inventory and Locally Significant Wetland Determinations
This report documents the update of the Medford Local Wetlands Inventory (LWI). It also documents the identification of locally significant wetlands in Medford.
Medford Riparian Inventory and Assessment: Bear Creek Tributaries (June 2002)
The purpose of this project was to inventory riparian areas along streams in Medford and to assess riparian area functions. "Riparian areas" are defined as "the area adjacent to a stream consisting of the area of transition from the aquatic ecosystem to a terrestrial ecosystem" in Medford's Municipal Code (Section 10.921).
Southeast Plan (April 2, 1998; revised December 16, 2004)
The primary purpose of the Southeast Plan planning process, funded by state transportation grants, was to find ways to reduce future auto traffic within the area. The resulting Southeast Plan has many features intended to help achieve that goal and create a more livable community.
Transportation System Plan (11/20/2003)
A Transportation System Plan (TSP) establishes a city's goals in developing its transportation system for both the short and long term. The Medford TSP outlines a 20-year plan to guide transportation improvements and enhance general mobility throughout the City. The Plan identifies both existing and future needs, and includes improvements to meet those needs.