Lozier Lane Improvement Project: W. Main to Stewart (STA1806 550)

This is a joint City/County project which is being designed and administered by the Medford Public Works Department. The construction contract has been awarded to Oregon Mainline Paving. View Map

December 2017:
Oregon Mainline Paving has completed Phase 1 and Phase 2 of the Lozier Lane Improvement Project and the facility is open for public use.  Phase 3 improvements, Lozier Lane (Stewart to Prune), are scheduled to begin mid-January 2018 and be completed at the end of September 2018. 

March 2018:
Oregon Mainline Paving has completed water facility installation and is currently finishing installation of irrigation facilities on Phase 3. Street excavation and storm drain improvements are scheduled to commence following acceptance of the irrigation improvements. This project is scheduled to be complete at the end of September 2018.

July 2018:
Phase 3 improvements on Lozier Lane (Stewart Avenue to Prune Street) continue with Oregon Mainline Paving excavating the new street section and backfilling with an aggregate base. All of the underground facilities have been installed and are in use; water, irrigation, and storm drain system(s). Overall, Phase 3 completion date is scheduled for the end of September 2018.

October 2018:
Street paving, concrete driveways, street lighting and sidewalks are being placed as the project construction deadline approaches. Overall, Phase 3 completion is scheduled for the first week of October 2018.  

December 2018:
Construction has been completed and a small list of items remain to be corrected.

March 2019:
List of items to be corrected continues to be completed by the Contractor. Striping repairs were completed in March.  Remaining items requiring repair are scheduled to be completed in April 2019.  Once complete, Project will be accepted.
 

Lozier Lane Update   


July 2019:
Improvements within the right of way have been accepted and close-out phase underway.  City annexing right of way section that is within Jackson County as needed to perform jurisdictional duties. 


1806

Project Details

Start Date:
1/16/2013
Est. Completion Date:
11/30/2018
Project Status:
Construction
Contact Name:
Public Works Engineering
Contact Phone:
(541) 774-2100
Contact Email: